MIL-DTL-29479A(MC)
Manufacturing requirements - Continued.
TABLE I.
SEAM/
STCH
STCH TYPE
BOB/
NO
OPERATION
TYPE
STCH/IN
NDL
LPR
a. Position the slide fastener on
301
LSbj-2
12-14
50/3
50/3
the left fly facing and left fly
interlining with bottom end of chain
1/4 inch above the fly notch and top
edges even. The front edge of chain
shall be 1/2 to 5/8 inch from front
edge of finished fly. Stitch slide
fastener tape to the fly through the
interlining with a double row of
stitches 3/16 to 1/4 inch gage.
17 Make right fly.
Finished appearance. The right fly
shall finish without bulkiness,
twists, puckers or pleats.
a. Position the slide fastener on
301
LSbj-2
12-14
50/3
50/3
the fly with the slide fastener tape
1/2 inch from the overedged seam and
the top edges even. Stitch the slide
fastener to the fly 1/2 inch from the
back edge of fly.
18 Join left and right fly to front.
Finished appearance. The seam
joining the fly assemblies to the
front shall be without pleats,
puckers, twists or other distortions.
a. Position the left fly assembly on
301
SSa-1
12-14
50/3
50/3
the outside of left front, face to
face, with notches matching. Join
left fly assembly to front with a 1/2
inch seam.
18 Join left and right fly to front.
(cont'd)
b. Turn joining seam onto fly
301
LSb-1
12-14
50/3
50/3
assembly and stitch 1/16 inch from
seamed edge, starting at top raw edge
of fly and stitching to the notch.
c. Turn left fly to the inside with
joining seam 1/16 to 1/8 inch back of
folded edge. Press front edge
without damage to the fastener,
forcing out the seams to the edge.
16
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business