MIL-DTL-82125B(MC)
Manufacturing requirements - Continued.
TABLE I.
SEAM/
STCH
STCH
BOB/
NO
OPERATION
TYPE
TYPE
STCH/IN
NDL
LPR
24 Join facing and fronts with tape.
a. Join facings to fronts, 3/16 inch
301
SSad-1
10-14
A
A
and
from top and front edges of the cape,
with the 1/4 inch wide stay tape
SSe-2
positioned on the interlining side of
(a)
fronts and caught in the stitching.
Continue the stitching along the
gorge and neck with a 3/8 inch seam,
from collar notch to collar notch,
catching all plies of fronts, facing,
collar, and neck facing, and with the
ends of the hanger properly
positioned and caught in the
stitching. The tape shall be sewn
with slight tension and shall extend
from the collar notch to
approximately 1-1/2 inches above the
bottom edge of the cape.
b. Remove all basting stitches, trim
upper front corner of facings for
proper turning.
c. Press open the front edges smooth
and flat with a heated pressing iron
or pressing machine, removing the
fullness.
25 Baste neck, front edges and bottom
turn-up.
a. Turn the facing-lining assemblies
to the inside of fronts, completely
working out the corners.
b. Baste along top and front edges
101
Hopper
and along the gorge and neck facing,
and
working the seam to the edges. The
301
basting shall extend approximately 3
or
inches from the bottom edge of
Hand
facing.
c. Baste the entire bottom turn-up
301
Hopper
along the top edge of the rayon tape,
or
including the facing turn-up.
101
or
Hand
18
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business