
MIL-DTL-29396B(MC)
Manufacturing requirements - Continued.
TABLE I.
SEAM/
STCH
STCH
BOB/
NO
OPERATION
TYPE
TYPE
STCH/IN
NDL
LPR
b. Baste around outside armhole
Hand
adjacent to the armhole seam, forcing
or
out the armhole in the basting. The
301
Hopper
basting shall extend from the backarm
seam of sleeves to the front notch of
jacket.
58 Set underarm shields to jacket.
a. Position the underarm shield on
the lining side of jacket with the
raw edges even with lower edge of
armhole.
b. Baste the underarm shields to the
Hand
jacket along the vertical center and
or
top, side and bottom edges.
301
Hopper
59 Stitch sleeve-head pads and linings
at armhole.
Finished appearance. The armhole
shall not be distorted or puckered
due to stitching the sleeve-head pads
and linings at the armhole.
a. Position the sleeve-head pad on
the sleeves with the folded edge of
the pad approximately 1/8 inch back
from the raw edge of the armhole-
sleeve seam, and with one end of the
pad matching the notch in the fronts.
b. Stitch the sleeve-head pad to the
301
SSa-1
4-6
24/4
24/4
sleeve from end to end, through the
armhole-sleeve seam allowance, 1/8
inch from the folded edge of the pad,
catching the front and back linings
and the shoulder pad in the
stitching. Continue stitching the
linings around the remainder of the
armhole, catching the underarm
shields in the stitching and trimming
away the excess material.
c. The underarm shield may be basted
to the armhole prior to stitching.
36
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business