
MIL-DTL-29396B(MC)
Manufacturing requirements - Continued.
TABLE I.
SEAM/
STCH
STCH
BOB/
NO
OPERATION
TYPE
TYPE
STCH/IN
NDL
LPR
52 Baste shoulder.
a. Position the front lining and
Hand
jacket front interlining at the neck,
or
shoulder and armhole edges of the
301
Hopper
fronts. Baste all plies together on
the outside along the front edge of
armhole and continue along the
shoulder seam and the gorge, catching
the shoulder pad in the basting.
Turn the jacket on the inside.
53 Baste back lining and facing-lining
assembly at shoulders.
a. Turn under and lap the shoulder
Hand
edge of the back lining on the
facing-lining assembly. Baste lining
along the folded edge of the back
lining with the top end of the chest
pleat and eyelet cover caught in the
basting.
54 Seam neckline with size label and
jacket hanger.
Finished appearance. The neckline
shall finish smooth and flat, without
twists, pleats or puckers. The size
label shall be positioned between the
ends of the jacket hanger and the
ends of the jacket hanger shall be
positioned so that in the finished
jacket, the hanger opening shall be 2
± 1/8 inches long when measured along
the lower edge of collar lining.
a. Join facings and back lining to
301
SSa-1
10-14
A
A
jacket at the neckline from collar
notch to collar notch, with a 1/4
inch seam and with the upper edge of
the size label and the ends of the
hanger positioned and caught in the
stitching at the inside center back.
54 Seam neckline with size label and
jacket hanger. (cont'd)
b. Press the neckline of the jacket
smooth and flat with a heated
pressing iron or pressing machine.
34
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business