MIL-DTL-29397B(MC)
Manufacturing requirements - Continued.
TABLE I.
SEAM/
STCH
STCH
BOB/
NO
OPERATION
TYPE
TYPE
STCH/IN
NDL
LPR
a. Stitch braid through fronts and
301
SSav-2
10-14
A
A
interlining on both sides of the
(silk)
(silk)
braid 1/16 inch from edges. The line
of stitching shall start and finish
at the harp as shown on Figure 4.
b. Braid may be stitched without
301
SSav-2
10-14
A
A
basting, provided the requirements
(silk)
(silk)
previously mentioned are maintained.
c. Hand stitch the inner edges of
Hand
8-10
C
horizontal braid together on both
(silk)
fronts from harp ends to end of
buttonhole opening on left front and
from harp ends to front end of braid
on right front.
38 Interline fronts.
a. Position the left and right
301
Hopper
fronts on the respective jacket front
or
interlining and baste the front to
Hand
the interlining from approximately
3-1/2 inches down from the shoulder
edge to approximately 2 inches from
the bottom edge of the front.
b. Baste along the shoulder,
301
Hopper
allowing room for setting the
or
shoulder pad and working the fullness
Hand
toward the armhole. Baste along the
front of the armhole approximately
1-1/2 inches from the edge and
continue to baste down the back edge
of interlining, across the waist
dart, to approximately 2 inches from
the bottom edge of fronts. Baste
along the top edge from the basting
stitches for the shoulders to
approximately 1-1/2 inches from the
front edge. Continue to baste
approximately 1-1/2 inches from the
front edge to the bottom edge of
fronts.
39 Trim jacket front interlining.
a. Trim the top edge of jacket
interlining even with the top edge of
fronts from the point of shoulder to
the collar notch.
b. Notch the top edge of the
interlining in line with the collar
notch.
30
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business