MIL-DTL-29397B(MC)
Manufacturing requirements - Continued.
TABLE I.
SEAM/
STCH
STCH
BOB/
NO
OPERATION
TYPE
TYPE
STCH/IN
NDL
LPR
c. Trim excess facing material where
necessary.
44 Baste front edges.
a. Turn the facing-lining assemblies
to the inside of fronts, completely
working out the edges.
b. Baste along the front edge of
101
left and right fronts, working the
or
facing and eyelet cover back from the
Hand
folded edge of piping.
45 Baste facing (second time).
a. Baste the facing to the fronts
Hand
approximately 1-1/4 inches from the
or
top, front and bottom edges of the
301
Hopper
jacket, holding the lower corner of
the jacket in such a manner as to
cause the lower front edge of the
fronts to roll inward towards the
back edge of the facing.
b. Turn under and baste the top edge
Hand
of the facing even with the fronts
or
from the collar notch to the front
301
Hopper
edge, catching the turned under
portion of the facing in the basting.
c. Baste the facing to the fronts as
Hand
close as possible to the facing-
or
lining seam, placing the fullness
301
Hopper
over the chest and distributing the
fullness in the facing in accordance
with good commercial practice. The
basting shall extend from
approximately 3 inches from shoulder
edge of facings to approximately
1-1/4 inches from the lower edge of
facing.
d. Turn under the bottom edge of
Hand
facing at the mark and baste along
or
Hopper
the folded edge.
301
46 Tack facing to interlining.
a. Tack the right and left facing-
Hand
4-6
lining seam allowance to the
or
respective jacket front interlining
301
SSm-1
4-6
from approximately 2 inches from
bottom edge of jacket to
approximately 3 inches from the
shoulder edge.
33
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business