MIL-DTL-29478A(MC)
Manufacturing requirements - Continued.
TABLE I.
SEAM/
STCH
STCH
BOB/
NO
OPERATION
TYPE
TYPE
STCH/IN
NDL
LPR
45 Baste facing (second time).
a. Baste the facing to the fronts
Hand
approximately 1-1/4 inches from the
or
top, front and bottom edges of the
301
Hopper
coat, holding the lower corner of the
coat in such a manner as to cause the
lower front edge of the fronts to
roll inward towards the back edge of
the facing.
b. Turn under and baste the top edge
Hand
of the facing even with the fronts
or
from the collar notch to the front
301
Hopper
edge, catching the turned under
portion of the facing in the basting.
c. Baste the facing to the fronts as
Hand
close as possible to the
or
facing-lining seam, placing the
301
Hopper
fullness over the chest and
distributing the fullness in the
facing in accordance with good
commercial practice. The basting
shall extend from approximately 3
inches from shoulder edge of facings
to approximately 1-1/4 inches from
the lower edge of facing.
d. Turn under the bottom edge of
Hand
facing at the mark and baste along
or
the folded edge.
301
Hopper
46 Tack facing to interlining.
a. Tack the right and left
Hand
4-6
facing-lining seam allowance to the
or
respective coat front interlining
301
SSm-1
4-6
from approximately 2-1/2 inches from
bottom edge of coat to approximately
3 inches from the shoulder edge.
47 Baste front linings to coat.
a. Fold the front lining in
Hand
accordance with the notches forming
or
the chest pleat, and baste along the
301
Hopper
entire center of the pleat. The
folded edge of the pleat on the
outside of the lining shall be
towards the armhole.
34
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business